We are working around the clock to make sure that the Studio is up and running by the end of May. We hired Mr. Bill to help with construction. It feels like equipment is being delivered daily and therefore, there is a lot of work to do. We put in temporary stairs to access the roof more easily, aesthetically lined the inside of the skylights with cedar to match the ceiling in the Studio, and made a home for the storage baskets. Check out the photos to see how far we are coming along.
No comments:
Post a Comment